TM 55-1945-205-24-40003 00 21/22 blank 0003 00ONSHORE MOORING LEGS LocationThe onshore mooring legs are attached to the FC causeway and located on the third and fifth intermediate sections from the beach.The onshore mooring legs secure the shoreward end of the floating causeway to the beach. The four onshore legs for a floating causeway are stowed and transported in a 20 ft full access ISO container. The onshore mooring leg is designed to perform in soft soils, sand and competent rock.An onshore mooring leg contains the following items:Four 120 lb NAVMOOR anchors.One or more 1 in. wire rope assembly that is 300 ft long.One horizontal padeye.One 1 3/8 in. bolt type anchor shackle.Two carpenter stop assemblies.One snatch block.One hoist hook cable.One griphoist.One master link.Five 1 in. shackles.One flounder plate.Two anchor bridles.Four 7/8 in. shackles.DescriptionThe onshore mooring container is placed on the deck of the first floating causeway raft. Once the raft is beached, the wire rope assemblies, padeyes and necessary shackles for the first two onshore legs (1) can be assembled and brought ashore for attachment to bulldozers (2). The remainder of the container contents can be assembled with the container on the floating causeway or the container may be moved to the beach before the remaining contents are assembled.12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business