TM 55-1945-205-24-4
0186 00 1
0186 00
UNIT LEVEL MAINTENANCE
FLOATING CAUSEWAY
LIGHT TOWER ENGINE VALVE COVER
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 54, WP 0253 00)
Gloves, Mens and Womens (Leather Palm) (Item 16, WP 0253 00)
Goggles, Sun, Wind and Dust (Safety) (Item 18, WP 0253 00)
Helmet, Safety (Brown) (Item 20, WP 0253 00)
Life Preserver, Vest (Item 25, WP 0253 00)
Gloves, Chemical (Item 14, WP 0253 00)
Goggles, Industrial (Chipping, Chemical) (Item 17, WP 0253 00)
Wrench, Torque (10-250 in. lbs) (Item 59, WP 0253 00)
Materials/Parts
Assy Cover, Cylinder Head
(0XWR1)
PN 16261-1450-0
Gasket
(0XWR1)
PN 15951-9666-0
Qty 3
Cleaner (Item 7, WP 0252 00)
Personnel Required
Engineer 88L
References
TM 55-1945-205-10-4
Equipment Condition
Light Tower Negative Battery Terminal Lead Removed. (WP 0131 00)
REMOVE LIGHT TOWER ENGINE VALVE COVER
WARNING
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
1.
Disconnect engine breather hose (1) from valve cover (2).