• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) - TM-5-1940-277-34_174
CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) - TM-5-1940-277-34_176

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  153    154    155    156    157  158  159    160    161    162    163  
TM 5-1940-277-34 CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS e. Loosen ter- a.Use flat tip minal screws and/or 13 mm (10) and wrench. remove alter- nator wires b.Tag wires and (11) from ter- make a loca- minals. tion diagram for correct reconnection of wires on replacement control box (3). f. Unscrew Use channel lock collar (12). pliers. g. Unscrew nut Use 1-5/8 in (13). wrench. h. Separate Use screwdriver. shielding retainer (14) freeing Shielding. i. Pull shielded Keep nut (13) cable (15) for reinstalla- out of con- tion. trol box (3). j. Unscrew collar (16) and dis- connect plug (17). k. Loosen nut Use 10 mm open (18) and end wrench. remove bat- tery wire (19). Change 1  2-149







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.