• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) - TM-5-1940-277-34_178
CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) - TM-5-1940-277-34_180

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  157    158    159    160    161  162  163    164    165    166    167  
TM 5-1940-277-34 CONTROL BOX REPLACEMENT INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS NOTE Before    exchanging    or    discarding    used    control    box    check    replacement    control    box    for interconnector  wires  between  components.    Transfer  needed  cables  from  used  control  box  to replacement box. INSTALLATION: 3. Work area Control box (3) a. Remove four Use screwdriver. screws (5), four washers (6) and con- trol box cover (7). b. Remove two Use screwdriver. screws (8) and voltage regulator box cover (9). c. Inspect new control box (3) for inter- connect wires between compon- ents. d. Transfer any Replacement con- needed inter- trol box may not connect wires have interconnect from used wires installed control box by supplier. to new con- trol box. e. Install See page engine wiring "Engine Wiring harness (20) Harness Replace- in control ment Instruc- box (3). tions" for pro- cedures. 2-153







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.