• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ENGINE BLOCK INSPECTION AND REPLACEMENT INSTRUCTIONS (cont) - TM-5-1940-277-34_521
measurement points for engine block warpage

TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
  500    501    502    503    504  505  506    507    508    509    510  
TM 5-1940-277-34 ENGINE BLOCK INSPECTION AND REPLACEMENT INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS * Place block Use hoist to in immersion lift. tank of water, heated to 180 - 212 F for 20 minutes. WARNING Always  use  safety  goggles  when  using  dry  compressed  air.    High  air  pressure  can  cause  injury and cut the skin. •    After 20 Use air compres- minute immer- sor. sion period apply 80 - 100 psi air pressure to block. •    Check for air bubbles leaking from cylinder block (indi- cation of cracks in block). •    Release air pressure and remove block from immer- sion tank. •    Remove cover over water pump hole (3) and 1/2 in steel plate and gas- ket (2) on top of block. 3-91







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.