TM 5-1940-277-34 TRANSMISSION REPAIR INSTRUCTIONS (Continued) LOCATION ITEM ACTION REMARKS b. When seated, torque cap screws to 27-37ft-lb. NOTE FOLLOW-ON MAINTENANCE PROCEDURE: Perform transmission oil pump installation procedure (reference page 2-337).  Perform control valve installation procedure (reference page 2-327). Change 6 3-163/(3-164 blank)