TM
5-5420-226-20-2
INTERMEDIATE SCAVENGER TUBE REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Installation
1/4 in. flat-tip screwdriver
TOOLS:
1/2 in. socket with 1/2 in. drive
1/2 in. combination box and open end wrench
7/16 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
9/1 6 in. socket with 1/2 in. drive
9/16 in. combination box and open end wrench
SUPPLIES:
Lockwasher (2 required)
Gasket
Self-locking nut (2 required)
Silicone compound (Item 32, Appendix D)
REMOVAL:
NOTE
Replacement of left or right side intermediate scavenger
tube is the same.
Go on to Sheet 2
Change 2