• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PARKING BRAKE CONTROL ASSEMBLY AND LINKAGE REPLACEMENT - Continued
PARKING BRAKE CONTROL ASSEMBLY AND LINKAGE REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  706    707    708    709    710  711  712    713    714    715    716  
img
TM 5-5420-226-20-3
PARKING BRAKE CONTROL ASSEMBLY AND LINKAGE REPLACEMENT (Sheet 15 of 17)
24.
Position lever (Y) onto base(N) and secure with straight headed pin (AE).
25.
Using pliers, secure straight headed
pin (AE) with new cotter pin (AF).
26.
Using hammer and 1/4 inch punch, install
straight pin (AG) and, using hammer and
1/8 inch punch, install new spring pin (AH)
securing lever (Y) to base (N).
Position clevis (X) onto lever (Y) with
27.
holes alined.
28.
Install straight headed pin (AJ).
29.
Using pliers, install new cotter pin (AK).
30.
Using 9/16 inch wrench, tighten nut
(w).
Go on to Sheet 16
13-104






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.