• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONNECTING LINK REPLACEMENT
ROD END REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  872    873    874    875    876  877  878    879    880    881    882  
img
TM 5-5420-226-20-3
CONNECTING LINK REPLACEMENT (Sheet 2 of 2)
INSTALLATION
1.
Position washer (A) and connecting link (B) onto shaft (C).
Position connecting rod (D) onto clevis of connecting link (B) and secure with bolt (E).
2.
Install connecting rod (F) onto connecting link (B) and secure with bolt (G).
3.
Using 9/16 inch wrench, tighten bolts (E and G).
4.
5.
Install washer (H) and shield (J) onto shaft (C) and, using 7/16 inch wrench, install and
secure washer (K) and screw (L) into shield (J).
6.
Using 3/4 inch wrench, install and secure washer (M) and nut (N).
7.
Using pliers, install cotter pin (P).
8.
Install powerplant (page 5-14).
End of Task
TA169385
15-25






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.