• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
LINK ASSEMBLY REPLACEMENT - Continued
CONNECTING LINK REPLACEMENT

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  870    871    872    873    874  875  876    877    878    879    880  
img
.
TM 5-5420-226-20-3
LINK ASSEMBLY REPLACEMENT (Sheet 3 of 3)
INSTALLATION:
1.
Position link (A) and two washers (B) in connecting link bracket (C).
2.
Using hammer, drive shaft (D) through bracket (C), washers (B), and link (A) until shaft
(D) is flush with bracket (C). -
3.
Using allen wrench, install setscrew (E) and nut (F) into bracket (C). Using 7/16 inch
wrench to hold nut (F), tighten setscrew (E) into groove of shaft (D). Tighten nut (F)
against bracket (C).
4.
Using 9/16 inch socket, install two bolts (G) through link (A) and rod end bearings (H).
Using torque wrench, tighten bolts (G) to 15-30 lb-ft (22-27 N m).
Using 3/8 inch wrench, install grease fitting (J) into link (A).
5.
Install transmission shroud (page 9-6).
6.
7.
Install top deck (page 16-23).
TA169383
End of Task
15-23






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.