• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued
DETAILED TROUBLESHOOTING PROCEDURE LAUNCHER OPERATION - HYDRAULICS - Continued

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  96    97    98    99    100  101  102    103    104    105    106  
img
. . . .
TM 5-5420-228-24
DETAILED TROUBLESHOOTING PROCEDURE
Symptom-2.1
LAUNCHER OPERATION ­ HYDRAULICS
(Continued)
5
Check tongue cylinder for leaks, damage or
excessive heat.
First Technician (Operator's Station)
Raise tongue cylinder control lever for five
minutes.
Second Technician (Launcher Tongue)
Visually check tongue cylinder for leaks, or
damage. Check outer surface for overheating.
Is tongue cylinder leaking, damaged or
overheating?
TONGUE
CYLINDER
6
7
Replace tongue cylinder
Replace tongue dual
(page 3-234).
counterbalance valve (page
YES
NO
3-204.8).
Change 3
2-74.3/(2-74.4 blank)






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.