• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HEU HOSE ASSEMBLIES "AT", "AU", "AV", FITTINGS AND COUNTERBALANCE VALVE "DC" REPLACEMENT (Sheet 2 of 4)
HEU HOSE ASSEMBLIES "AT", "AU", "AV", FITTINGS AND COUNTERBALANCE VALVE "DC" REPLACEMENT (Sheet 4 of 4)

Launcher Hydraulics System M48A5/M60A1 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 Page Navigation
  400    401    402    403    404  405  406    407    408    409    410  
img
.
TM 5-5420-228-24
HEU HOSE ASSEMBLIES "AT", "AU", "AV", FITTINGS AND COUNTERBALANCE
VALVE "DC" REPLACEMENT (Sheet 3 of 4)
INSTALLATION:
NOTE
Remove all caps and plugs as necessary during installation.
1.
Position counterbalance valve "DC" (A) and use socket and ratchet to install four mounting bolts (B).
2.
Place new preformed packing (C) on elbow (D). Use adjustable wrench to install elbow (D) into "V2" port on counter
balance valve "DC" (A).
3.
Use adjustable wrench to install tube "AV" (E) onto elbow (D). Position new preformed packing (C) on elbow (F) and
install elbow (F) onto tube "AV" (E).
4.
Place new preformed packing (C) on elbow (G) and use adjustable wrench to install elbow (G) into "V1" port on
counterbalance valve "DC" (A).
Go onto Sheet 3
3-204.34
Change 3






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.