• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALL DUNNAGE MATS IN ISO CONTAINER - TM-55-1945-205-10-2_239
LIGHT TOWERS - TM-55-1945-205-10-2_241

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  192    193    194    195    196  197  198    199    200    201    202  
TM-55-1945-205-10-2 0037 00 4 0037 00 :,1* 2. Place three 4 X 4 dunnage wood blocks (6), spaced evenly apart, on the container pallet (8) where the dunnage mats (5) can be stacked on them. :,1* 3. Using forklift or appropriate handling device, install the first stack of dunnage mats (5) in the 20 ft ISO container (8). 4. After installation of the first stack of dunnage mats (5), install three 4 X 4 dunnage wood (6) on top of the dunnage mats (1). 127( A total of thirty six mats are stored in each container. 5. Repeat previous steps for installation of the remaining three stacks of dunnage mats (5). 6. Install ratchet strap tiedowns (9) to secure dunnage mats (5) to ISO container pallet. 7. Install flat bars (10) on side of container to secure dunnage mats (5) in ISO container (8). &,21 Prior to moving or lifting ISO container, ensure doors are closed and locked. Damage to ISO container will occur if any door is open or unlocked while container is moved or lifted. 8. Close the ISO container (8) side doors and latch in the closed position. END OF WORK PACKAGE







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.