• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
INSTALLATION OF D-RING/CLOVERLEAF AND DECK CLEAT FITTINGS
ASSEMBLY OF MODULE STRINGS - TM-55-1945-205-10-2_96

TM-55-1945-205-10-2 Water Purification Barges NSN (1930-01-234-2165) Volume 9-3 Electric Power System Manual
Page Navigation
  62    63    64    65    66  67  68    69    70    71    72  
TM 55-1945-205-10-2 0011 00 1 0011 00 OPERATOR MAINTENANCE ROLL-ON/ROLL-OFF DISCHARGE FACILITY MODULE STRINGS OPERATION UNDER USUAL CONDITION INITIAL SETUP: Tools Tool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0121 00) Life Preserver, Vest (Item 33, WP 0119 00) Gloves, Men’s and Women’s (Leather Palm) (Item 25, WP 0119 00) Goggles, Sun, Wind and Dust (safety) (Item 27, WP 0119 00) Helmet, Safety (Item 29, WP 0119 00) Crowbar (Item 16, WP 0119 00) Hammer, Hand (10 lb Sledge) (Item 29, WP 0119 00) Personnel Required Seaman 88K Equipment Condition Module ISOPAK Disassembled (WP 0008 00) Operation Of Male And Female Guillotine Connectors (WP 0009 00) PREPARATION FOR USE - ASSEMBLY OF MODULE STRINGS :,1* All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death. 127( Ensure that end rake modules and center module are completely aligned before locking the guillotine connectors. 1. Align male (1) and female (2) connectors on end rake module with connectors on center module.







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.