Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
ASSEMBLE (cont) - TM-5-1940-277-34_311
CYLINDER HEAD ASSEMBLY REPLACEMENT INSTRUCTIONS (Continued) - TM-5-1940-277-34_313
TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
290
291
292
293
294
295
296
297
298
299
300
TM 5-1940-277-34
CYLINDER HEAD ASSEMBLY REPLACEMENT INSTRUCTIONS
This task covers:
a.
Removal
b.
Installation
INITIAL
SETUP
Tools:
Equipment Condition:
Condition Description:
Ratchet
with 1/2 in drive
TM 5-1940-277-20
Cooling system
drained.
6 in extension
TM 5-1940-277-20
Air cleaner
removed.
3/4 in socket
TM 5-1940-277-20
Turbocharger removed.
Torque
wrench
TM 5-1940-277-20
Header tank/heat
(O - 175 ft-lb)
exchanger removed.
Air
compressor
TM 5-1940-277-20
Intercooler removed.
Air blow gun
TM 5-1940-277-20
Manifolds
removed.
Putty knife
TM 5-1940-277-20
Fuel filter
assembly
Safety goggles
and transmission oil
cooler with bracket
Materials/Parts:
removed.
TM 5-1940-277-20
Rocker arm shaft
Engine oil
assembly and push rods
Cylinder head gasket
removed.
TM 5-1940-277-20
Injectors removed.
Personnel Required: Two
2-291
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business