Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
TRANSMISSION REPAIR INSTRUCTIONS (cont) - TM-5-1940-277-34_592
HYDROJET ASSEMBLY REPAIR INSTRUCTIONS - TWO STAGE IMPELLER SECTION
TM-5-1940-277-34 Boat Bridge Erection Twin Jet Aluminum Hull Model USCSBMK1 (1940-01-105-5728) Manual
Page Navigation
571
572
573
574
575
576
577
578
579
580
581
TM 5-1940-277-34
TRANSMISSION REPAIR INSTRUCTIONS
(Continued)
LOCATION
ITEM
ACTION
REMARKS
b.
When seated,
torque
cap
screws to
27-37ft-lb.
NOTE
FOLLOW-ON MAINTENANCE PROCEDURE: Perform transmission
oil pump
installation procedure
(reference page 2-337). Perform control valve installation procedure (reference page 2-327).
Change 6
3-163/(3-164 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business