TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
STEERING PUMP AND HOSES REPLACEMENT
REMOVAL AND INSTALLATION
INITIAL SETUP:
References
Tools and Special Tools
Forward Repair System (FRS)
Equipment Condition
Materials/Parts
Control access panel opened
(TM 5-1940-322-10).
Engine hatches opened and secured
(TM 5-1940-322-10).
Hydrojet hatches opened and secured
(TM 5-1940-322-10).
Personnel Required
Two
0030 00-1