TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
ENGINE HATCH COVER, HINGES, AND SUPPORT BRACE MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (Contd)
Forward Repair System (FRS)
Materials/Parts
Personnel Required
Two
References
Equipment Condition
Engine hatches opened and secured
(TM 5-1940-322-10).
0081 00-1