Home
Download PDF
Order CD-ROM
Order in Print
INSTALLATION -831980596
SCOOP HYDRAULIC CONTROL VALVE, CONTROL VALVE HOSES, CONTROL LINKAGE, AND MAIN FRAME BRACKETS MAINTENANCE CONTROL VALVE HOSES REMOVAL, MAIN FRAME BRACKET REMOVAL, CONTROL VALVE REMOVAL, CONTROL VALVE LINKAGE REMOVAL, CONTROL VALVE DISASSEMBLY, CLEANING AND INSPECTION, CONTROL VALVE ASSEMBLY, CONTROL VALVE LINKAGE INSTALLATION, CONTROL VALVE INSTALLATION, MAIN FRAME BRACKET INSTALLATION, AND CONTROL VALVE HOSES INSTALLATION
TM-5-1940-322-24 Bridge Erection Boat (BEB) MK II-S NSN: 1940-01-526-0770 Manual
Page Navigation
478
479
480
481
482
483
484
485
486
487
488
TM
5-1940-322-24
0133
00
SCOOP
HYDRAULIC
PUMP,
MOUNTING
BRACKET,
AND
HOSES
MAINTENANCE
(Contd)
1
5
6
24
3
23
7
4
~
3
22
2
8
21
20
18
19
9
10
17
16
14
15
12
9
10
11
19
13
12
25
END
OF WORK
PACKAGE
0133
00-5/
(6
blank
)