TM 5-1940-322-24
FIELD MAINTENANCE INSTRUCTIONS
BRIDGE ERECTION BOAT (BEB)
MK II-S
P/N 12492423
SCOOP HYDRAULIC PUMP, MOUNTING BRACKET, AND HOSES MAINTENANCE
REMOVAL, CLEANING AND INSPECTION, AND INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Materials/Parts (Contd)
Forward Repair System (FRS)
References
Materials/Parts
TM 5-1940-322-10
Equipment Condition
Scoop control hydraulic reservoir drained
0133 00-1