TM5-2090-202-12&P
TM 2090-12&P/1A
2-10. LAUNCHING, FAST WATER - Continued
m. Remove retainer (19) from bolt (20); remove bolt (20) from retainer block (21). Place winch cable (22) on sheave
(23), and thread it through hole in dolly crossmember (24); connect hook (25) to face of dolly (26). Align winch cable (22)
on sheave (23); install retainer block (21), bolt (20); and retainer (19).
n. Rewind the boom cable and retract the dolly until it is fully forward. Continue to rewind the cable and adjust the
boom until the cradle is fully on the transporter.
o. Disengage the power take-off and return the transporter to shore.
2-23/(2-24 Blank)