TM5-2090-202-12&P
TM 2090-12&P/1A
CHAPTER 3
UNIT MAINTENANCE INSTRUCTIONS
INDEX
TITLE
SECTION
PAGE
Service Upon Receipt of Materiel ......................................................................... I
Repair Parts, Special Tools, and Equipment ........................................................
Lubrication Instructions ........................................................................................
III
3-3
Unit Preventive Maintenance Checks and Services (PMCS) ................................
IV
3-4
Troubleshooting ...................................................................................................
Maintenance ........................................................................................................
VI
3-8
Section I. SERVICE UPON RECEIPT OF MATERIEL
3-1. UNPACKING AND CHECKING THE EQUIPMENT
The rear stanchions are banded to the inside of the cradle frame. The roller assemblies and the rear stanchion brackets
are banded to the dolly assembly.
a. Remove any metal strapping, tapes, wrapping paper, or any other shipping and protective items.
b. Inspect the equipment for damage incurred during shipping. If the equipment has been damaged, report the
damage on DD Form 6, Packaging Improvement Report.
c. Check the equipment against the packing slip to see if the shipment is complete. Army users report
discrepancies in accordance with the instructions in DA Pamphlet 738-750. MC users report discrepancies in accordance
with MCO P 4610-19.
d. Check to see whether the equipment has been modified.
e. Perform the following at the cradle:
(1) Loosen turnbuckle (1) on the lashing
cable (2).
(2) Remove cotter pin (3) washer (4) and
straight pin (5). Remove turnbuckle pins
(6) and store cable assembles on
transporters.
3-1