• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Master Heater Switch, Hi- Lo Switch And Indicator Light Replacement (Sheet 6 of 8)
Master Heater Switch, Hi-Lo Switch And Indicator Light Replacement (Sheet 8 of 8)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  82    83    84    85    86  87  88    89    90    91    92  
img
TM 5-5420-202-20-3
MASTER CONTROL PANEL REPAIR (Sheet 46 of 73)
Master Heater Switch, Hi-Lo Switch And Indicator Light Replacement (Sheet 7 of 8)
12. Apply silicone compound to two electrical connectors (circuit 400).
13. Connect two electrical connectors (circuit 400) to rear of heater switch (P)
by pushing in.
14. Place switch (P) in position on panel.
15. Place guard (Q) in position on switch (P).
16. Using screwdriver, install two screws (R) and lockwashers (S) securing guard (Q) and
heater master switch (P) to panel.
Go on to Sheet 8
TA249024
10-83


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.