• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY JUMPER CABLE ASSEMBLY REPLACEMENT (Sheet 5 of 6)
BATTERY TERMINAL LUG REPLACEMENT (Sheet 1 of 2)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  250    251    252    253    254  255  256    257    258    259    260  
img
. . .
TM 5-5420-202-20-3
BATTERY JUMPER CABLE ASSEMBLY REPLACEMENT (Sheet 6 of 6)
8.
Place battery jumper cable assembly (B) in position in two hull floor loop clamps (J).
9. Using socket, install two capscrews (K) and lockwashers (L) securing two loop clamps
(J) and three battery jumper cable assemblies to hull floor.
10. Install three battery ground
straps (page 10-266).
11. Check batteries for operation
(TM 5-5420-202-10).
End of Task
TA249191
10-250


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.