• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BATTERY TERMINAL LUG REPLACEMENT (Sheet 2 of 2)
BATTERY AND BATTERY COVER REPLACEMENT (Sheet 2 of 5)

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  253    254    255    256    257  258  259    260    261    262    263  
img
. . . . .
TM 5-5420-202-20-3
BATTERY AND BATTERY COVER REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
10-253
10-256
Cleaning and Inspection
Installation
10-256
9/16 in. combination box and open end wrench
TOOLS:
1/2 in. combination box and open end wrench (2)
Wire brush
SUPPLIES:
Bicarbonate of soda
Rags (Item 65, Appendix D)
Grease (Item 37, Appendix D)
Lockwashers (4 required)
TM 5-5420-202-20-10
REFERENCE:
PRELIMINARY  PROCEDURE:
Turn MASTER BATTERY switch to
OFF (TM 5-5420-202-10)
TA249194
Go on to Sheet 2
10-253


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.