• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SHIFTING CONTROL BRACKET ASSEMBLY AND CONNECTING LINK REPLACEMENT - Continued
SHIFTING CONTROL BRACKET AND LINK ASSEMBLY REPAIR

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  497    498    499    500    501  502  503    504    505    506    507  
img
. . . . .
TM 5-5420-202-20-3
B R A C K E T ASSEMBLY REPAIR (Sheet 1 of 1)
TOOLS:
Hammer, 2 lb.
3/4 in. drive pin punch
Vise
REFERENCE:
LO 5-5420-202-12
PRELIMINARY
PROCEDURE:
Remove bracket from vehicle (page 11-38)
INSPECTION:
Inspect bearing (A) for damage or wear.
DISASSEMBLY:
Using hammer and punch, remove bearing (A) from bracket (B).
ASSEMBLY:
Using vise, press bearing (A) in bracket (B).
1.
2.
Install bracket in vehicle (page 11-39).
Lubricate (LO 5-5420-202-12).
3.
End of Task
TA249306
11-40


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.