• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONNECTING LINK REPLACEMENT
ROD END REPLACEMENT

Maintenance Manual For Launcher,Tank Chassis Transporting: For Bridge Armored-Vehicle-Launched: Scissoring-Type; Class 60 And 70 -3 Page Navigation
  887    888    889    890    891  892  893    894    895    896    897  
img
TM 5-5420-202-20-3
CONNECTING LINK REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
Position washer (A) and connecting link (B) onto shaft (C).
1.
Position connecting rod (D) onto clevis of connecting link (B) and secure with bolt (E).
2.
Install connecting rod (F) onto connecting link (B) and secure with bolt (G).
3.
4.
Using 9/16 inch wrench, tighten bolts (E and G).
Install washer (H) and shield (J) onto shaft (C) and, using 7/16 inch wrench, install and
5.
secure washer (K) and screw (L) into shield (J).
6.
Using 3/4 inch wrench, install and secure washer (M) and nut (N).
7.
Using pliers, install cotter pin (P).
Install powerplant (page 5-14).
8.
End of Task
TA249648
15-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.