TM 5-5420-203-14
d. Loading/Unloading the Scissored Bridge to/from a Lowbed Semitrailer using a Second
Launched Bridge as a Ramp - CONT
NOTE
The bridge should be laid on the trailer so that the leading edge of the quadrant is centered over
the gooseneck and positioned 4 ft. 5 in. from the rear curve in the gooseneck.
The inner deck panels should make contact with the length of the 4 x 4 in. x 5 ft. timber
laid across the gooseneck. This timber should be positioned 1 ft. 4 in. from the rear curve
in the gooseneck.
The ends of the bridge should overhang the end of the trailer by approximately 6 ft. 4
in., and the side overhang of the bridge should be approximately 2-1/2 ft. on each side.
See the sketch below.
WARNING
Be sure the bridge is secure and stable on the flatbed before disconnecting tongue from
bridge. If not properly seated and in a stable state, bridge could shift rapidly and fall.
You could be crushed. Stay clear of bridge when the tongue is being removed. Inspect
for stability before continuing operation.
(n) Disengagement of Launcher Sequence.
1 Ensure a clearance exists prior to releasing the tongue's hold on bridge. Withdraw the tongue
by moving lever #2 slightly up and down, releasing the load from the tongue pintles and cross
pins.
2 Engage the hydraulic clutch by lifting up on the hydraulic clutch pump lever #7. Set engine
to 1800 RPM.
2-102 Change 2