TM 5-5420-203-14
e. Loading/Unloading a Scissored Bridge to/from a Lowbed or Flatbed Semitrailer using
This Task Covers:
(1) Loading
(2) Unloading
Initial Setup:
EQUIPMENT CONDITIONS:
Serviceable
TOOLS/EQUIPMENT:
General Mechanics Tool Box, SC 5180-
90-N26
MATERIALS:
Wooden blocks, 8 x 8 in. x 3-4 ft.,
four each (to rest folded bridge on
ground)
(1) Loading.
WARNING
The loading/unloading operation of the bridge is dangerous. If the hydraulic system fails
during the operation and the bridge breaks loose, property can be damaged and personnel
seriously hurt, if not killed. Essential personnel should always take extra precautions
when working around the bridge and equipment; NEVER place yourself under or in the
path of the bridge, if it were to fall. Non-essential personnel should stay clear of the
loading/unloading operation at all times, remaining at least 50 feet away. Always be
aware of what actions are going on around you at all times. Be sure to know your route
of escape in event of an emergency.