(7)(8)(9)(10)(11)(12)(13)NOTEStart disassembly from downstream end of bridge.Have boat secure to bay being removed.Ensure four bay/bay connectors (7) are unlatched.Unlatch two (only one on ramp bay) roadway/roadway connectors (8).Lower handrails (8).Open hydraulic pump access covers (10), close manual vent valves (11), set pump control levers (12) toTRANSPORT position, and close covers (10).Install T wrench (13) on lower lockpin screw (14), turn counterclockwise, and retract lower lockpin.Repeat Step (12) for remaining lower lockpin screw and move bay to retrieval site.Figure 2-29. Bridge Recovery Swinging Bridge Method (Sheet 2 of 3).(14) Engage (toward roadway) four (only two on ramp bay) roadway/bow ponton foldlocklatches (16).(15) Unlatch four roadway-to-bow ponton bridge latches (17).2-100TM 5-5420-209-12