TM 5-5420-209-12
d. Wear gloves when operating or handling metallic equipment.
e. Check fluid levels for proper levels.
2-31. Operation of Bridge in Rainy Conditions. Follow all procedures for operation during normal conditions
and the following special instructions:
a. Monitor river flow frequently and adjust anchorage accordingly.
b. Add additional interior bays as required.
c. Check bilges frequently for water accumulation in pontons.
2-32. Operation of Bridge in High Wind Conditions. Follow all procedures for operation during normal condi-
tions and the following special instructions:
a. Monitor river flow and add additional anchorage as required.
b. Monitor bridge centerline movement and add additional anchorage as required.
c. Remove large debris from upstream side of bridge.
d. Ensure deck roadway connections remain engaged.
2-33. Operation of Bridge in Hot and Dry Conditions. Follow all procedures for operation during normal
conditions and the following special instructions:
a.
b.
c.
d.
e.
f.
Check fluid and coolant levels frequently for proper levels.
Check filter frequently for contamination.
Keep moving parts clean and well lubricated.
Avoid excessive handling of metallic surfaces.
Vent bilges periodically.
Remove buildup of sand or debris from working surfaces.
2-130