TM 5-5420-209-12
3-25. Connecting Pin Trunions and Lever, Ramp Bay.
This task covers: Service
INITIAL SETUP
Tool
Materials/Parts
Grease Gun
Oil, Lubricating (Item 8, Appendix E)
Rags, Wiping (Item 12, Appendix B)
a. Service. (figure 3-22)
(1) Install grease gun on lube fitting (1) and inject grease until clean grease appears between
pin (2) and lever (3), and remove excess.
(2) Lubricate pivot points with oil and remove excess.
3-46