(13) Install gasket (8), strainer (7), gasket (6), and flange (5) and secure with six screws (4).
(14) Close drain plug (3).
NOTE
Over filling reservoir will cause overflow when boom is lowered.
(15) Add hydraulic fluid until level is halfway between upper and lower marks on level gage (16).
(16) Install filler cap (2).
(17) Lower and raise boom (1) several times and recheck level with boom (1) in full vertical position. Add hydraulic
fluid as needed.
Figure 4-65. Hydraulic Reservoir, Service.
FOLLOW-ON MAINTENANCE: Install bay (para. 2-27).