4-50. Hydraulic Reservoir Assembly. - Continued
c Repair. (figure 4-67)
NOTE
Hydraulic reservoir removed for repair. Discard lockwashers, preformed packings and
gaskets.
(1) Remove six screws (1), flange (2), gasket (3), strainer (4), and gasket (5).
(2) Remove four screws (6), lockwashers (7), cover (8) and gasket (9).
(3) Remove strainer.
(4) Remove two nuts (11), preformed packings (12) and remove fluid level gage (13).
(5) Loosen nut (14) and remove elbow (15), and remove nut (14).
(6) Remove nut (16), preformed packing (17) and elbow (18).
(7) Remove nut (19), tube (20), clinch sleeve (21) and fitting (22).
Dry cleaning solvent PD-680 used to clean parts is potentially dangerous to personnel and property.
Avoid repeated and prolonged skin contact. Do not use near open flame or excessive heat. Flash point
of solvent is 100-138 °F (38-60 °C).
(8) Clean all items, except gaskets and preformed packings, with dry cleaning solvent and dry thoroughly.
(9) Inspect all components and replace if damaged.
(10) Install fitting (22), tube (20), clinch sleeve (21) and nut (19).
(11) Install preformed packing (17), elbow (18), and secure with nut (16).
(12) Install nut (14) on elbow (15) and install elbow (15) and tighten nut (14).
(13) Install level gage (13) and secure with two nuts (11) and preformed packings.
(14) Install strainer (10).
(15) Install gasket (9) and cover (8) and secure with four screws (6) and lockwashers (7).
FOLLOW-ON MAINTENANCE: Install bay (para 2-27).
TM 5-5420-209-12
4-196