TM 5-5420-209-124-54. Power Takeoff Control Lever and Linkage (Model 2280).This task covers:a. Replaceb. RepairINITIAL SETUPToolsMaterials/PartsGeneral Mechanic’s Automotive Tool KitSolvent, Dry Cleaning (Item 19, Appendix E)(Item 1, Appendix B)Rags, Wiping (Item 13, Appendix E)Hydraulic Testing Equipmenta“ Replace. (figure 4-73)(1) Remove two nuts (1), screws (2), and lockplate (3).(2) Remove cotter pin (4), pin (5), and separate link (6) from lever (7).NOTEFront winch control lever and transfer selector levers are also installed on hand control shaft.(3) Remove two cotter pins (8), washers (9), hand control shaft (10), spacer (11), and lever (7).(4) Remove two cotter pins (13), and remove link (13).(5) Remove cotter pin (14), pin (15), and link (6).(6) Remove two nuts (16), screws (17) and remove control assembly (18).(7) Install control assembly (18) and secure with two screws (17) and nuts (16).(8) Install link (13) and secure with two cotter pins (12).(9) Install link (6) and secure with pin (15) and cotter pin (14).NOTEFront winch control lever and transfer selector levers are also installed on hand control shaft.(10) Install lever (7) and secure with hand control shaft (10), spacer (11), two washers (9), and two cotter pins(8).(11) Install link (6) on lever (7) and secure with pin (5) and cotter pin (4).(12) Install lockplate (3) and secure with two screws (2) and nuts (1).4-208
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business