4-61. Front Support. - Continued
(9) Install spacer plates (8) and secure with screws (7) and nuts (6). Torque screws to 85-95 ft-lbs (115-129 Nm).
(10) Install screws (3) and nuts (2) securing fuel tank mounting bracket (5) to front support (4).
FOLLOW-ON MAINTENANCE:
(1) Install cab protector (para. 4-58).
(2) Install dual over center valve (para. 4-45).
(3) Install hydraulic fitter assembly (para. 4-9).
(4) Install control valve (para. 4-44).
(5) Install select or valve (para. 4-5).
(6) Install throttle control (para. 4-39).
(7) Install locking cylinder, pin, arm, and quick release pin (para. 4-42).
(8) Install walkways (para. 4-26).
(9) Install front rollers (para. 4-28).
(10) Install tire carrier assembly (para. 4-27).
(11) Lower and secure boom.
(12) Service hydraulic reservoir (para. 4-50).
4-62. Center Support.
This task covers: Replace
INITIAL SETUP
Tools
Equipment Conditions:
General Mechanics Automotive Tool Kit
Walkways removed (para. 4-26).
(Item 1, Appendix B)
Bogie brackets removed (para. 4-58).
Lifting Device
a. Replace. (figure 4-83)
(1) Raise boom fully and block in position.
(2) Remove eight nuts (1) and screws (2).
(3) Connect center support (3) to suitable lifting device and remove center support (3) and
shims (4).
(4) Install center support (3), and shims (4) and secure with eight screws (2) and nuts (1).