Table 2-11. Operator Preventive Maintenance Checks and Services (PMCS) for the Ramp Bay cont.LocationInterval ‘Item To be InspectedEquipment Is NotItem toProcedureReady/Available IfService/Check57DuringApproachInspect for cracks, ruptured seams, andRamp retainingRampsbroken welds.hardware missing ordeformed.58AfterRibbon BridgeAfter operation, clean all dirt, mud, and debrisComponentsfrom ribbon bridge components and lubricatein accordance with LO 5-5420-209-12.,CAUTIONDuring PMCS, ensure that all components and assemblies are correctly installed. Incorrectinstallation may cause additional equipment damage or failure.NOTEThis PMCS use the one-look format, beginning with the Roadside Bow Ponton (RBP) asviewed from the rear of transporter, clockwise.Remove rust and accumulated corrosion during PMCS. corrosion not removed promptly will de-grade equipment performance.Refer to Section III and LO 5-5420-209-12 for lubrication of Ribbon Bridge items after operation,clean dirt, mud and debris from equipment and lubricate, when required, in accordance with.Inspect all associated components on each item for structural damage and loose, broken or mis-sing hardware.Notify Unit Maintenance when noting any deficiency you are not authorized to correct.Table 2-12. Operator Preventive Maintenance Checks and Services (PMCS) for the Interior Bay.LocationintervalItem To be InspectedEquipment is Notitem toProcedureReady/Available IfService/Check1BeforeHinges andinspect hinges and pins for cracks andAny hinge cracked.Pinselongation.NOTETo effectively perform thefollowing steps, bay should bedown loaded from transporter.2BeforeUnfoldinginspect cover plate, spring pins, pins, lever,Broken welds noted orMechanismand link for cracks, broken welds anddeformation prevents(Roadside Bowdeformation.mechanism forPonton Rearfunctioning property.(RBPR))2-34TM 5-5420-209-12
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business