ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1t.Final designDuring the preceding design process, the information necessary to fill in the blanks below would have beenobtained. Fill in these figures in the pro-forma, at this point the design is considered complete.a.2E +Baysb.LNCG Settingc.FRB Settingd.RRB Settingd.Bearing : NBFBe.Truck/Trailer Loadsf.Manpower Requiredg.Time to Construct3-15DOUBLE STORY 2E + 1 thru 2E + 12 BAY DESIGN ON RESTRICTED SITESThe design procedures for DS bridges (2E + 1 through 2E + 12 bay) on restricted sites is the same as for normalsites except that:a.The length of the launching nose is increased by one or two launching nose heavy (LNH) sections. Thedecrease in the amount of R Distance required by increasing nose length can be seen in Table 3-23 below.b.During construction, the number of times that the bridge is boomed will be increased, and the distance ofeach boom will be decreased.NOTEThe distance for construction behind the FRB cannot be less than 9.1 m. If a vehicle and push barare needed to boom a bridge, add 11.3 m to R Distance given.TABLE 3-23. Effect of increasing nose length (DS bridges) on R distanceNo. ofLNHR DistanceLength of Bridge: 2E + No.of BaysAdded1m2m3m4m5m6m7m8m9m10m11m12m010.111.912.213.114.915.816.817.719.520.421.619.111.012.814.616.52No Advantage9.111.012.814.63-34
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business