ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
TABLE 3-26. Rule 1 - DS 13-22 Bay w/o LRS
Nose lift N with nose cross girder at:
2E + No. of Bays
Setting No. 6
Yellow
(g)
Setting No. 4
Yellow
(h)
Setting No. 2
Yellow
(h)
Tail Lift (T)
(j)
13
- 0.07
1.49
2.68
0.40
14
- 0.38
1.00
2.65
0.37
15
- 0.49
0.90
2.55
0.34
16
- 0.61
0.79
2.43
0.30
17
- 0.15
0.75
2.69
0.27
18
- 1.33
0.54
2.54
19
- 2.04
- 0.19
1.72
0.21
20
- 1.93
- 0.31
1.61
21
- 2.65
- 0.52
1.17
0.18
22
- 2.58
- 0.68
1.04
0.15
n.
Rule 2
Raise both the CRB and the RRB by 0.25 m as follows. Both roller beams are in the high position.
(1)
Raise both the CRB and RRB by 0.25 m to increase nose clearance (N), see Table 3-27, column (k) and
tail clearance (T), see Table 3-27, column (I).
(2)
If N Rule 2 is greater than H and T Rule 2 is greater than G, the bridge has adequate nose and tail
clearance for launching, proceed to loads required.
(3)
If N Rule 2 is not greater than H and T Rule 2 is greater than G, proceed to Rule 3a., Table 3-28, column
(m).
(4)
If N Rule 2 is greater than H and T Rule 2 is not greater than G, proceed to Rule 3b, Table 3-28, column
(n).
TABLE 3-27. Rule 2 - DS 13-22 Bay w/o LRS
Raise CRB and RRB by 0.25m
Raise CRB and RRB by 0.25m
2E + No. of
Bays
N
(k)
T
(l)
2E + No. of
Bays
N
(k)
T
(l)
13
2.93
0.65
18
2.79
0.49
14
2.90
0.62
19
1.97
0.46
15
2.80
0.59
20
1.86
0.46
16
2.68
0.55
21
1.42
0.43
17
2.94
0.52
22
1.29
0.40
3-39