ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1TABLE 3-26. Rule 1 - DS 13-22 Bay w/o LRSNose lift N with nose cross girder at:2E + No. of BaysSetting No. 6Yellow(g)Setting No. 4Yellow(h)Setting No. 2Yellow(h)Tail Lift (T)(j)13- 0.071.492.680.4014- 0.381.002.650.3715- 0.490.902.550.3416- 0.610.792.430.3017- 0.150.752.690.2718- 1.330.542.5419- 2.04- 0.191.720.2120- 1.93- 0.311.6121- 2.65- 0.521.170.1822- 2.58- 0.681.040.15n.Rule 2Raise both the CRB and the RRB by 0.25 m as follows. Both roller beams are in the high position.(1)Raise both the CRB and RRB by 0.25 m to increase nose clearance (N), see Table 3-27, column (k) andtail clearance (T), see Table 3-27, column (I).(2)If N Rule 2 is greater than H and T Rule 2 is greater than G, the bridge has adequate nose and tailclearance for launching, proceed to loads required.(3)If N Rule 2 is not greater than H and T Rule 2 is greater than G, proceed to Rule 3a., Table 3-28, column(m).(4)If N Rule 2 is greater than H and T Rule 2 is not greater than G, proceed to Rule 3b, Table 3-28, column(n).TABLE 3-27. Rule 2 - DS 13-22 Bay w/o LRSRaise CRB and RRBby 0.25mRaise CRB and RRB by 0.25m2E + No. ofBaysN(k)T(l)2E + No. ofBaysN(k)T(l)132.930.65182.790.49142.900.62191.970.46152.800.59201.860.46162.680.55211.420.43172.940.52221.290.403-39
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business