ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
Pallet Load DSC1.
(13) Stack two curbs on top of top panel on front of pallet.
DSC 1
FOR DSC1, PROCEED TO STEP(16).
Pallet Load DSC2.
(14) Stack four curbs on top of top panels on front of pallet.
DSC 2
(15) Secure load with ten 10,000 lb cargo tie-down straps, (four lengthwise straps and six crosswise straps), as
described in step a. (4).
Pallet Load DSC1.
(16) Secure load with nine10,000 lb cargo tie-down straps, (four lengthwise straps and five crosswise straps), as
described in step a. (4).
NOTE
To unload the pallets, carry out the steps In reverse order.
3-107