ARMY TM 5-5420-212-10-1MARINE CORPS TM 08676A-10/1-1(h)Tighten straps.(i)Tie rubber bumper across pallet load near rear of load.(j)Roll or wrap excess strap in a neat manner.NOTETo unload the pallet, carry out the preceding steps In reverse order.LRS 1b.Pallet Load LRS-2(1)Place four launching nose heavy sections and two baseplates on pallet.(a)Interlock baseplates with their dowel pins facing each other.(b)Stand baseplates on their long edge flush with front of pallet.(c)Ends of nose sections butt up against baseplates.(d)Sides of outside nose sections are placed flush with edge of pallet.(e)Inside nose sections are aligned with outer nose sections.(f)Place hydraulic jacks upright in outer nose section. Jacks should be placed against center vertical andtied securely to it with rope.CAUTIONMaintain jacks In an upright position to reduce leakage and damage to seals.3-116
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business