ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A10/1-1
(13) Boom to 3p4 (over RRB). Lock rollers, and disconnect push bar.
(14) Remove bay 8.
(15) Connect push bar. Unlock rollers and boom to 3p0 (over RRB). Lock rollers, and disconnect push bar.
(16) Remove bay 7.
(17) Connect push bar. Unlock rollers and boom to 2p3 (over RRB). Lock rollers, and disconnect push bar.
(18) Remove bay 6.
(19) Connect push bar. Unlock rollers and boom to 1p6 (over RRB). Lock rollers, and disconnect push bar.
(20) Remove bay 5.
(21) Connect push bar. Unlock rollers and boom to lp2 (over RRB). Lock rollers, and disconnect push bar.
(22) To remove eighth nose section (8N1):
(a)
With center crew prepared to move launching nose to rear of site, remove retainer clip and panel
pin from nose roller.
(b)
Move launching nose to rear until next anchorage tube is slightly behind nose roller (6N1).
(c)
Put panel pin through nose roller and anchorage tube.
(d)
Remove 8N1.
(23) Remove bay 4.
(24) Use same method step (22) to remove 7N1, 6N1, 5N1, 4N1 and 3N1.
(25) Follow steps (40) to (53) in paragraph 6-2 to complete disassembly of bridge.
6-59