Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
Section II. EXPENDABLE DURABLE SUPPLIES AND MATERIALS LIST (cont)
TABLE E-1 (contd) Components per Bridge Length (Single Story) - TM-5-5420-212-10-1_629
TM-5-5420-212-10-1 Improved Flaot Bridge Consisting of: Transporter Interior Bay Ramp Bay Manual
Page Navigation
597
598
599
600
601
602
603
604
605
606
607
ARMY TM 5-5420-212-10-1
MARINE CORPS TM 08676A-10/1-1
Appendix E
COMPONENTS PER BRIDGE LENGTH, BASKET AND PALLET LOADS
E-1
COMPONENTS PER BRIDGE LENGTH
TABLE E-1 Components per Bridge Length (Single Story)
Bridge Length
No. of Bays
4
5
6
7
8
9
10
11
12
Nose
Component
Construction
LLN
LLN
LLN
LLN
LLN
5N1
5N1
6N1
6N1
Adapter, Assembly Push Bar
-
-
-
-
-
1
1
1
1
Anchorage Pin Assembly, Mk 2’
4
4
4
4
4
4
4
4
4
Bag, Equipment
1
1
1
1
1
1
1
1
1
Baseplate, DS
-
-
-
-
-
-
-
-
-
Baseplate, SS***
2
2
2
2
2
2
2
2
2
Basket, Equipment
¨
4
4
5
6
6
6
7
7
7
Beam, Bankseat
2
2
2
2
2
2
2
2
2
Brace, Sway
-
-
-
-
-
-
-
-
-
Capsill
-
-
-
-
-
-
-
-
-
Carrying Bar
8
8
16
16
16
16
16
16
16
Carrying Handle
8
8
16
16
16
16
16
16
16
Clip, Panel Pin
14
16
18
20
24
35
37
40
42
Cross Girder, Building Frame
-
-
-
-
-
-
-
-
-
Cross Girder, Launching Nose
-
-
-
-
-
1
1
1
1
Cross Girder, Push Bar
-
-
-
-
-
1
1
1
1
Curb
8
10
12
14
16
18
20
22
24
Deck Unit
16
20
24
28
32
36
40
44
48
Extractor,Cable Assembly
1
1
1
1
1
1
1
1
1
Jack, Hydraulic, 15 ton
2*
2*
2*
2
2
2
2
2
2
Jack, Hydraulic, 20 ton
-
-
-
-
-
-
-
-
-
Jack Seating, Building Frame
-
-
-
-
-
-
-
-
-
Launching Nose Unit, Heavy
-
-
-
-
-
5
5
6
6
Launching Nose Unit, Light, Front
1
1
1
1
1
1
1
1
1
Launching Nose Unit, Light, Rear
1
1
1
1
1
1
1
1
1
Link, Launching Two Tier
-
-
-
-
-
-
-
-
-
Longitudinal Girder Bldg. Frame
-
-
-
-
-
-
-
-
-
Marker, Guide Assembly
6
8
8
12
10
12
12
16
14
E-1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business