TABLE E-1 (contd) Components per Bridge Length (Single Story)
Bridge Length
No. of Bays
4
5
6
7
8
9
10
11
12
Nose
Component
Construction
LLN
LLN
LLN
LLN
LLN
5N1
5N1
6N1
6N1
Sling, Multiple Leg
1
1
1
1
1
1
1
1
1
Support, Jack***
-
2
2
2
2
2
2
2
2
Wrench, Ratchet, Rev. 3/4 in
-
-
-
-
-
-
-
-
-
NOTE:
¨
Increase by 1 if anchorage is required.
*
If required by site conditions.
**
Two required for jack supports and baseplates for bad site conditions.
***
Quantity given required for RB. Two additional baseplates required under jacks if site conditions are bad for 6 thru
12 bay bridges.
****
Two required for baseplates and jacks when site conditions are bad.