• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WERPLANT TESTS (GROUND HOP) - Continued
WERPLANT TESTS (GROUND HOP) - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -2 Page Navigation
  31    32    33    34    35  36  37    38    39    40    41  
img
.
POWERPLANT TESTS (GROUND HOP) (sheet 9 of 16)
Stall Test (Sheet 1 of 5)
NOTE
Before performing stall test, check brake adjustment (page 13-78)
1. Remove right brake slave cylinder (page 13-58).
2. Remove left brake slave cylinder (page 13-54).
3. Position brake applicator tool over rod sticking out of brake housing (where slave cylinder
was).
Engage catch on tool into notch in brake housing.
4.
5.
Using 9/16 inch wrench, tighten nut to secure brake applicator tool to brake housing.
6.
Using 3/4 inch wrench, tighten nut to secure brake applicator tool to brake housing.
Using 3/4 inch wrench, set brake by rotating hex head bolt until bottom of bolt is approxi-
7.
mately 1 inch from top of tube.
TA107461
Go on to Sheet 10
Change 1
5-33


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.