TM
5-5420-226-20-2
TRANSMISSION SHROUD REPAIR (Sheet 1 of 6)
PROCEDURE INDEX
PAGE
PROCEDURE
Disassembly
Cleaning and Inspection
Assemblv
TOOLS:
7/1 6 in. combination wrench
Diagonal cutting pliers
7/1 6 in. socket with 1/2 in. drive
3 / 4 in. socket with 1/2 in. drive
3/4 in. combination box and open end wrench
Putty knife
Slip joint pliers
Ball peen hammer
Cold Chisel
Lockwire (Item 60, Appendix D)
SUPPLIES:
Dry cleaning solvent (Item 55, Appendix D)
Rags
Key washer (10873733) (4 required)
Self-locking nut (MS20500-428) (10 required)
Self-locking nut (MS20500-820) (6 required)
PRELIMINARY
PROCEDURE:
TA107964
Go on to Sheet 2