• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
RIGHT TAILLIGHT - STOPLIGHT ASSEMBLY REPLACEMENT - Continued
RIGHT TAILLIGHT - STOPLIGHT ASSEMBLY REPAIR

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  210    211    212    213    214  215  216    217    218    219    220  
img
.
TM 5-5420-226-20-3
RIGHT TAILLIGHT - STOPLIGHT ASSEMBLY REPLACEMENT (Sheet 3 of 3)
3. Shale two shells (F) on taillight leads (A).
4. Install two slotted washers (G) on leads (A) behind metal terminal.
5. Connect tagged or taped taillight lead (H) to
hull connector number 24 (J).
6. Connect remaining lead (K) to hull connector
number 23 (L).
7. Install transmission shroud (page 9-6).
8. Check for proper taillight operation
(TM 5-5420-226-10).
End of Task
TA168863
10-212


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.