TM 5-5420-202-20-3
TM 5-5420-226-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 5 of 6)
6.
Position cable assembly
(G) in vehicle.
7.
Thread cable assembly
(G) onto stowage
receptacle (H).
8.
Press cable (G) into
spring clamp (J)
on overhead crossbeam.
Place cable (G) in
9.
clamp (K) with har-
nesses (L) and (M).
10.
Using 7/16 inch
socket , install
screw (N) and new
lockwasher (P) to
secure clamp (K),
cable (G), and harnesses
(L) and (M) to over-
head crossbeam.
11.
Place cables (A)
and (G) inside clamp (Q).
12.
Using 7/16 inch
socket, install screw
(R) and new lockwasher
(S) to secure clamp
(Q) and ground leads
from gage indicator
and master control
panels to center post.
Go on to Sheet 6
10-295-67
6. 9
Change 6