TM 5-5420-226-20-3
TM 5-5420-202-20-3
INFRARED PERISCOPE CABLE REPLACEMENT (Sheet 2 of 6)
3.
At center post, use
7/16 inch socket
to remove screw
(F) that secure clamp
(G), cable assemblies
(B) and (C), and
ground leads from
gage indicator and
master control panels.
4.
On overhead crossbeam, use 7/16 inch
socket to remove screw (H) and lockwasher
(J) securing clamp (K), cable assembly
(B), and harnesses (L) and (M).
5.
Remove cable assembly (B) from clamp
(J).
Remove cable assembly (B) from spring
6.
clamp (N).
7.
At operator's station, unthread cable
assembly (B) from stowage receptacle
(P).
Remove cable (B) from vehicle.
8.
Go on to Sheet 3
5-66
10-296.64
Change 6