• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BRAKE PRESSURE GAGE, TUBE ASSEMBLY, REDUCER, AND GASKET REPLACEMENT - Continued
MASTER BRAKE CYLINDER-TO-BULKHEAD TUBE ASSEMBLY REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  644    645    646    647    648  649  650    651    652    653    654  
img
. . . . . . . .
TM 5-5420-226-20-3
MASTER BRAKE CYLINDER-TO-BULKHEAD TUBE ASSEMBLY REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
13-42
Cleaning and Inspection
13-44
13-45
Installation
TOOLS: 7/8 in. combination box and open end wrench
11/16 in. combination box and open end wrench
13/16 in. combination box and open end wrench
Ratchet with 1/2 in. drive
1-1/8 in. socket with 1/2 in. drive
Funnel, 1 qt. cap. with flexible spout
SUPPLIES
Container, 1 qt. cap.
Rags (Item 65, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Caps (2 required)
Brake fluid (Item 34, Appendix D)
REFERENCE
TM 5-5420-226-10
PRELIMINARY PROCEDURES:
Block tracks to prevent vehicle movement
(TM 5-5420-226-10)
Place MASTER BATTERY switch in OFF position
(TM 5-5420-226-10)
Place transmission shift lever in neutral "N"
(TM 5-5420-226-10)
TA169169
Go on to Sheet 2
13-42


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.