TM 5-5420-226-20-3
MASTER BRAKE CYLINDER-TO-BULKHEAD TUBE ASSEMBLY REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PAGE
PROCEDURE
Removal
Cleaning and Inspection
Installation
TOOLS: 7/8 in. combination box and open end wrench
11/16 in. combination box and open end wrench
13/16 in. combination box and open end wrench
1-1/8 in. socket with 1/2 in. drive
Funnel, 1 qt. cap. with flexible spout
SUPPLIES
Container, 1 qt. cap.
Rags (Item 65, Appendix D)
Dry cleaning solvent (Item 55, Appendix D)
Caps (2 required)
Brake fluid (Item 34, Appendix D)
REFERENCE
PRELIMINARY PROCEDURES:
Block tracks to prevent vehicle movement
Place MASTER BATTERY switch in OFF position
Place transmission shift lever in neutral "N"
TA169169
Go on to Sheet 2